Thursday 16 April 2015

Garage Construction Progress

The Garage is slowly being constructed after a small delay with sourcing a bricklayer to complete it. It's slowly getting there with the roof scheduled to be completed by the end of this week. (if the rain stops and all materials can be delivered)



Really happy with the extra space when we opted for the Garage extension. It provides plenty of usable space. As my land is backing on to a golf course, its very hard to get approval for a rear garden shed. So the small cost at construction offsets many potential future hassles.  



Our SS also wanted to know if we wanted to have the faux timber put on the front of the house between the pillars (same sheeting they used for the above gable - which is painted the wrong colour).

We said we wanted it. Since our design changed so much and they charged us around $500 dollars to add the sheeting while making the portico smaller and removing the side brickwork around the left hand window due to design guidelines. (even though two other double stories being built by them in the same town have them) We wanted it put on.

It should look good once it all goes on.